Designing the Olympic infrastructure, planned from 2019

The problem

Two global events, the Rugby World Cup 2023 and the Paris 2024 Olympics, on an infrastructure that must not fail.

The constraint

It was our first production run of container orchestration.

What I did

01

Starting very early

In 2019, I launch the build: we move ahead well before the events.

02

Designing the architecture

I draw the infrastructure for these two events, and I make the technical choices.

03

A first production run

We put container orchestration into production for the first time, after long preparation.

04

Two events delivered

The Rugby World Cup 2023, then the Paris 2024 Olympics.

Diagram: a timeline from 2019 to the Paris 2024 OlympicsA timeline starts in 2019, when the build is launched. Above it, an architecture plan of three blocks receives a block of containers put into production for the first time. The timeline reaches 2023, then 2024, where two medallions, rugby 2023 and Paris 2024, connect to the architecture.architecturefirst time201920232024Rugby 2023Paris 2024build started

The result

An infrastructure designed well in advance, for two global events.

Stack

  • Architecture
  • Container orchestration
  • Project management